Which component is NOT part of a Project Manual?

Prepare for the ExAC Section 3 exam with our comprehensive materials. Utilize flashcards and multiple choice questions, complete with hints and detailed explanations, to ensure you're well-prepared for your architectural certification! Ready to ace your exam?

The correct answer is that working drawings are not considered part of a project manual. The project manual typically comprises a collection of documents that guide the construction process and include bid forms, technical specifications, and contract conditions.

Bid forms are the documents used by contractors to submit their proposals, which detail the pricing and terms of the bid. Technical specifications provide detailed information on the quality and type of materials, workmanship, and installation methods required for the project. Contract conditions outline the legal obligations, rights, and responsibilities of the parties involved in the contract.

On the other hand, working drawings are detailed graphical representations of the design. They include plans, sections, and details that convey how the project is to be built. While they are crucial for guiding construction, they are typically separate from the project manual and are often part of the architectural drawings package. Hence, working drawings do not belong in the project manual, making it the correct answer.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy